Flyovers
and their consequences to traffic under construction
The Works Ministry, Kuala Lumpur has submitted
proposals to build 10 flyovers at four major roads in Kota Kinabalu under the
11th Malaysia Plan (11MP), in addition to two flyovers currently under
construction at Jalan Lintas. That was reported on April 23, 2015.
Works Minister Datuk Seri Haji
Fadhillah Haji Yusuf said whether they would be approved is expected to be
announced in June this year.
Fadhillah said the Government has
approved an allocation of RM262 million to upgrade two intersections along
Jalan Lintas by building two flyovers at Jalan Kolam and Jalan Tuaran
intersections.
The scope of the project involves
expanding the road to a dual three-lane carriageway that stretches 6.3
kilometres, he said.
Fadhillah said this project was part
of the outer ring road project in Kota Kinabalu which would be implemented in
phases as it incurred a huge cost of RM1.11 billion.
Now just revealed that 4 more
flyovers be constructed in the road towards 1Borneo to ease terrible congestion
there.
It is to be realised that with the
construction of such flyovers in Kota
Kinabalu, lots of diversions of the traffic were necessary for the
construction.
It is noticed that quite a few
parties are involved with the construction of flyovers and diversions of
traffic thereof. Such diversions can
cause a lot of problems especially exacerbation in the already heavy traffic
congestion in those limited roads for the heavy traffic to move around.
Also such diversions must be properly
signs posted and that the road users must know how to handle such diversions to
get to the various destinations in the vicinity to avoid unnecessary delays and
traffic accidents/incidents which can be very frustrating.
We do not know who are really responsible for the planning
and implementing of the diversions which must be beyond clarity and no
confusion to avert any likely accidents.
Are the co-ordinations amongst various parties involved
really being positive to avert any inconvenience/accidents and massive traffic
congestion as a result of ill programmed in diversions?
Some new traffic signs can be misleading to the motorists
resulting in possible accidents as drivers very much depend on accurate and
valid sign to keep moving in the right momentum of traffic flows especially
whatever congestions as a result of the construction in progress could be
minimised especially in the few peak hours.
If we have ten flyovers in 11th Malaysia Plan,
then there will a few more new ones to be constructed.
Generally, I feel that the traffic signs around the diversion
sites can be confusing until the motorists master the new design of the flows
of the traffic to get to the appropriate destinations quickly.
So there can be some improvement in the diversions quickly to
expedite less congestion.
Take the Jalan Pintas now a very busy dual carriage as once
it was quite quiet and little congestion.
Most traffic is avoiding the Lido carriageway to come to Jalan Pintas. So Jalan Pintas can be clogged at both ends
namely the sole tunnel in KK end and the other end at the Jalan Pintas/Jalan
Lintas traffic light junction.
Jalan Pintas is also the outlet for the very busy 88 market
place (88MP) and Austral park (AP), and I suggest that it is worthwhile to open
up an outlet at the entrance to 88 Marketplace so that traffic from 88mP and AP
can turn right toward the tunnel rather than go all the way towards near Grand
Millennium in Jalan Pintas on the way to Donggongon. The other traffic from the tunnel to various
housing estates in Kepayan and Taman Sri Kepayan can choose to move on to the
“U turn only” at the traffic lights junction at Jalan Lintas which is still in
progress of construction.
With a new opening to turn right at the outlet at
88marketplace, the flows of traffic would be improved.
Can the authorities also do some improvement to the
round-about next to the tunnel and Queen Elizabeth Hospital to improve the flow
of traffic (now congestion in many hours daily) as the several flyovers
construction in Jalan Lintas can be a few years to go?
Would also appreciate if the authorities consult the local motorists/residents
residing in the zones where flyover constructions are in progress even before
the diversions in public hearing, rather than just accept the questioned
diversions as we have witnessed of late?
Joshua Y C Kong 19/8/2017